Case Study: Abbotsford Entertainment Centre
Project Team Supplier: Barr Plastics Installer: Saxon Mechanical Limited Operator: The Abbotsford/ Mission Water and Sewer Services BARR Product Total capacity was 4000 usg. 15,100 L Narrow Pro le Rain...
Case Study: Abbotsford Entertainment Centre
Project Team Supplier: Barr Plastics Installer: Saxon Mechanical Limited Operator: The Abbotsford/ Mission Water and Sewer Services BARR Product Total capacity was 4000 usg. 15,100 L Narrow Pro le Rain...








